Bill Woodfull Reserve Maldon

The Bill Woodfull Reserve Drainage Reconstruction was on behalf of the Mt Alexander Shire. This project consisted of a number of different types of drains from swale to stone drains and also heritage works. The project had a very strict time frame in which works had to be completed. An additional 25% of works were added to the project by Mt Alexander Shire , Roadside Completed the original scope and the extra works within the original time frame and budget was kept.

roadside Bill Woodfull Reserve Maldon 1

roadside Bill Woodfull Reserve Maldon 2

roadside Bill Woodfull Reserve Maldon 3

roadside Bill Woodfull Reserve Maldon 4